The reduced power capacity of the system is because of different kinds of losses. The average annual energy requirement in the department of mechanical engineering office is 1086.24 kWh and the energy available through solar panel is 1143.6 KWh, whereas energy supplied to the user is 1068.12 kWh a little less than the required load. Analysis of performance ratio and losses has also been done using PVsyst simulation software. This paper presents the study of load requirement in mechanical department office in engineering college Bikaner and accordingly, designing and installation of stand-alone solar PV System. The total installed solar power in India till 30th April 2020 is 34811.78 MW. ![]() ![]() Solar energy is quick creating source of energy in all over the world.